Mermaid GO chart
7 operators · 6 signalsSignal topology only. Operator type, trip, standby demand, delay, autonomy, and k-of-m live on the card.
Live diagram
After Run: output colors vs the R(t) target; other operators heat by unavailability share.
| ID | Name | Type | λ / year | Ai |
|---|---|---|---|---|
| ats | ATS | T6 | 0.99996 | |
| gen | Diesel generator | T6 | 0.99943 | |
| load | Success logic | T1 | 1.00000 | |
| or1 | OR logic | T2 | 1.00000 | |
| pdu | PDU | T1 | 1.00000 | |
| ups | UPS | T1 | 0.99892 | |
| util | Utility feeder | T5 | 0.99977 |
Select an operator in the diagram or table to edit parameters.
Analytical: Type 6 standbyFor (demand on loss of a source) is sequenced; Monte Carlo is the system result.
Run Monte Carlo to estimate inherent availability, expected downtime, R(t), and which blocks drive unavailability.